Power Transmission Line Investigation (Coal Power) March 2008-June 2008 / (Client:CMEC-China National Machinaery & Equipment Import- Export Corporation)
- Puttalum Coal Power Plant Project ??? Overhead Transmission Line from & Veyangoda substation Area
Drilling Experience Utilized in Grater Kurunegala Sewerage Project ; 2014
(Client : National Water Supply and Drainage Board);
- Core-drilling of 155 holes at the sites with a total drilled length of 1500 m
- Interpretation of results of Investigation, compilation of geotechnical data for the design report.
- Total period for overall investigation project was about 30 days.
??